Skip to Content
  • +34 611 457 522
My Website
  • 0
  • 0
  • Sign in
  • English (UK) Español
  • Contact Us
  • Home
  • About us
  • Catalogue
  • Blog
  • Contact
My Website
  • 0
  • 0
    • Home
    • About us
    • Catalogue
    • Blog
    • Contact
  • +34 611 457 522
  • English (UK) Español
  • Sign in
  • Contact Us

News

from the wind sector
Wind Energy in Spain in 2026: Growth, Investment and Offshore Expansion
7 Apr 2026
Lola García
Wind energy in Spain continues to establish itself as one of the main pillars of the national energy system. In 2026, the sector experiences sustained growth driven by development...
Read more

The million-dollar question: what happens to turbines after they are decommissioned?
7 Apr 2026
Lola García
What happens to wind turbines after their decommissioning? The decommissioning of wind turbines marks the beginning of a post-service life cycle, where inspection and refurbishment...
Read more

Why is the market for used wind turbines growing?
7 Apr 2026
Lola García
The market for used wind turbines has experienced sustained growth in recent years, driven by operational, technical, and lifecycle factors of wind turbines. This increase...
Read more

Repair, refurbishment and retrofit
7 Apr 2026
Lola García
Key differences in industrial maintenance and wind turbines The difference between retrofitting, refurbishment of industrial equipment, and industrial repair is one of the most common questions...
Read more

Flying over Aditae Technology
7 Apr 2026
Lola García
Headquarters and facilities of Aditae Technology The facilities of Aditae Technology reflect the company's commitment to innovation, engineering excellence, and technological development. Designed...
Read more

Cannibalisation of wind turbines
7 Apr 2026
Lola García
Within the wind sector, the cannibalisation of wind turbines refers to the practice of dismantling functional components from a decommissioned wind turbine to reuse them as spare parts in...
Read more

What happens to wind farms that reach the end of their useful life?
7 Apr 2026
Lola García
When wind farms reach the end of their design life, operators must assess the most appropriate strategy to ensure safety, efficiency, and environmental responsibility. The options...
Read more

REPOTEN 2: a key opportunity to modernise renewable energy in Spain
7 Apr 2026
Lola García
The Ministry for Ecological Transition and the Demographic Challenge (MITECO), through the Institute for the Diversification and Saving of Energy (IDAE), has approved the second call of the progr...
Read more

Our storage facilities
7 Apr 2026
Lola García
Repowering projects often raise questions about the decommissioning phase of a wind farm: What to do with all the material? Will there be a designated space to store this type of equipment?
Read more

Comparing the LCOE of Wind Energy in Spain: Refurbished vs. New Wind Turbines
7 Apr 2026
Lola García
LCOE of wind energy Introduction Spain is one of the European leaders in wind energy, with over 29 GW of installed wind power in 2024. The country's commitment to renewable energy...
Read more
Aditae Technology SL
Home About us Products Services Privacy policyHelp Contact us
Síganos
Copyright ©Aditae Technology
Powered by Odoo - The #1 Open Source eCommerce